OCD Services

Greenfield Orchard Development

We transform bare paddocks into high-producing, resilient orchards. From initial surveying and ground prep to post ramming, shelter and plant work, our team handles the entire build.

Built Right the First Time. Engineered to Protect Your Crop

Starting an orchard from scratch is a major capital investment. Juggling separate contractors for earthworks, post ramming, wire work, artificial shelter, irrigation and planting leads to delays, miscommunication, and costly structural errors.

OCD delivers a seamless, single-contractor approach. Born and bred in the kiwifruit capital, our team combines hands-on horticultural knowledge with heavy-duty construction standards. We maximize every square meter of your titled land, ensuring your canopy orientation, row spacing, and shelters are optimized for maximum sun, wind protection, and long-term yield.

OCD Core Solutions

Site Surveying & Footprint Design

We map your block to optimize row layouts, shelter placement, and machinery accessways. Precision mark-outs ensure you get the absolute maximum productive cropping area from your land title.

Post Ramming & End Assemblies

Using dedicated heavy machinery, we install high quality posts and construct rock-solid end assemblies engineered for full canopy weight.

Canopy Wiring, Cables & Agbeam

We run heavy-gauge end cables, high-tensile wire and durable agbeam infrastructure. Every line is tensioned to exact specifications to prevent sagging under heavy fruit loads.

Irrigation & Planting Setup

We install tailored irrigation networks designed for even water distribution across your block, followed by careful planting using best-practice horticultural techniques.

Why Choose OCD for Your Greenfield Project

Project Management

Single point of contact from bare land to cropping.

Footprint Maximization

Precision surveying to squeeze maximum canopy area from your boundary.

Structural Integrity

Engineered for heavy crop loads and high wind loads.

Workmanship

We stand by every post rammed.

Frequent Questions

How far in advance should we start planning our development?

Ideally, we recommend reaching out 6 to 12 months before your target planting date. This window gives us ample time to carry out precision site surveying, design your block footprint to squeeze maximum yield from your boundary, and lock in high-grade timber and materials before peak seasonal shortages. Crucially, it also ensures all heavy earthworks and post ramming are completed before wet winter conditions set in.

Do you supply all materials & heavy machinery?

Yes, we provide a complete turnkey service with our own specialized fleet and trusted supply partnerships. From laser-guided post rammers and tractors to certified high-density timber, high-tensile wire networks, irrigation fittings, and agbeam systems, we supply all equipment and materials required to deliver your build from start to finish without relying on third-party hire delays.

What regions do you service?

Our home base is in Te Puke and the wider Bay of Plenty, but our crew and machinery are fully mobile. We take on commercial greenfield developments, shelter builds, and structural maintenance contracts right across the North Island, frequently partnering with growers and agricultural investors throughout the Bay of Plenty, Waikato, Hawke’s Bay, and surrounding growing hubs.

How do you quote Greenfield developments?

We start with a free, no-obligation site consultation on your block to inspect terrain, soil conditions, wind exposure, and machinery access. From there, we draft a tailored proposal detailing exact plant footprint projections, material specifications, build stages, and a transparent cost breakdown, ensuring complete clarity and fixed expectations before any posts go into the ground.