Hua Kiwi
Project Type:
Green Field Development.
Ongoing maintenance
Date:
November 2019
Location:
Waimea Drive

Another job completed for EHC at Hua Kiwi Orchard.

Challenges

This was a big project with a few interesting challenges. We replaced a whole block of end assemblies to prepare for a G3 conversion and got rid of fish tales to maximise the use of space. We completed two block extensions with one bearing weight, where we needed to hold it until we could join up again. There was also a small new block in an area that was previously unusable so we needed to come up with a solution to join 2 blocks together that were on different angles without the potential for wires to slip down the cable. Also a couple of safety barriers were put up where shelter trees had been removed. Overall we were very happy with the result.

Scroll Gallery
No items found.
Build your dream orchard with us today.
Start now